Case Study


Notice: Undefined variable: breadcrumb_id in /home/ihcukcom/public_html/wp-content/themes/twentyseventeen-child/category.php on line 13

Home » Case Study

Eddie Stobart

When Eddie Stobart found themselves with a 200m x 100m (20,000 square metre) warehouse in which they were storing product that needed to be kept above 10 degrees C they turned to IHC (Independent Heating & Cooling) for a solution.

View Case Study

Large Engineering Facility – Eastbourne

A large engineering firm in Eastbourne, East Sussex were struggling along with their 45 year old two boiler setup. They turned to IHC for help to come up with the best solution possible, here is the result.

View Case Study
Copyright © 2024 Independent Heating & Cooling | Site Map | Privacy Policy