Eddie Stobart
When Eddie Stobart found themselves with a 200m x 100m (20,000 square metre) warehouse in which they were storing products that needed to be kept above 10 degrees C they turned to IHC (Independent Heating & Cooling) for a solution.
Large Energy Efficient Heating System Installation in Eastbourne
A large engineering firm in Eastbourne, East Sussex were struggling along with their 45 year old two boiler setup. They turned to IHC for help to come up with the best solution possible, here is the result.
Reduction in carbon footprint with the use of a commercial bivalent system
The Buhler Group, a Swiss company renowned for its innovative solutions in the grain and food industry, sought a more environmentally friendly heating solution to reduce their carbon footprint. IHC stepped in to provide the implementation of air-to-water heat pump technology, combined with efficient boilers and a sophisticated control system.
Case Study: IHC Commendation from Buhler UK Ltd
We are pleased to have received this commendation from Buhler UK Ltd following our recent work with them where we provided an air-source heat pump solution and covert control system, allowing Buhler UK Ltd to remotely log in to the controls and to move away from gas and utilise green electricity.
Brighton Jubilee Library – Replacement of Air Handling Unit Heat Exchangers
As part of their renewal programme, Brighton Jubilee Library, the largest running public library in the city of Brighton and Hove needed heat exchangers within the air handling units replacing and Independent Heating and Cooling were called in to help.
Boiler Replacement, East Sussex College – Lewes Campus
The reliability of these boiler units had diminished over time, and sourcing replacement parts had become increasingly difficult. In light of these challenges, East Sussex College engaged Independent Heating & Cooling to identify a cost-effective replacement solution.
Boiler system replacement, East Kent College
The East Kent College Group’s Canterbury Campus faced challenges with its existing boiler system, resulting in frequent component failures. By retrofitting and optimising the system with more efficient Ideal Evomax2 boilers, they achieved a cost-effective solution for improved reliability and performance while ensuring consistent heating and hot water throughout the campus.